Installation list

Name Quantity Name Quantity
MDVR device 1 MDVR ADC IO harness 1
Remote controller 1 Display 1
Front and back sensor 1 Common wiring tools n

Necessary instructions

  • Here we take MX-TSH51-SX as an example

** Actual picture**:

Necessary instructions

Operation steps

1. Wiring

1. Wiring

2. Device menu configuration

Remotely enter the menu>>Settings>>Alarm >>Input, configure ADC1 function: Positive, ADC2 function: pulse, confirm and save.

2. Device menu configuration

3. Test

The vehicle starts the rolling detection tank or simulates the can, and the alarm platform bubble box will display the real-time status (as shown below), and the historical data can be viewed in the forward and reverse report.